11:30 am
-
1:00 pm

Session

Workshop 2: Value-engineering projects to absorb labor and material costs

Development costs keep escalating at a pace so fast that price locks are impossible or on super short time frames. Raw material shortages are also slowing down the process and adding on costs. This workshop looks at ways to strategically value engineer projects to mitigate the escalating costs.

Speaker(s)

Back